Oasis @Tropicana Danga Cove Bandar Baru Puteri, Iskandar Malaysia, Johor Bahru, Johore, Malaysia
A commercial development to include 112 three-storey shop-offices with floor
spaces ranging from 475.5 to 673 square metres.
Works will include:
• internal road networks
• main water supply reticulation
• drainage system
• common lightings
Building elements will include:
• metal deck roofing with steel trusses
• reinforced-concrete framework and structures
• brick walls with plasters and emulsion paint finishes
• solid timber and plywood flush doors
• aluminium-framed casement windows and louvers
• cement render and homogeneous tile flooring
Construction is expected to start in the second quarter 2013. Construction is expected to end in the second quarter 2015.
Works will include:
• internal road networks
• main water supply reticulation
• drainage system
• common lightings
Building elements will include:
• metal deck roofing with steel trusses
• reinforced-concrete framework and structures
• brick walls with plasters and emulsion paint finishes
• solid timber and plywood flush doors
• aluminium-framed casement windows and louvers
• cement render and homogeneous tile flooring
Construction is expected to start in the second quarter 2013. Construction is expected to end in the second quarter 2015.
Comments